Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Amirtash, P, Majid Parchami, J and Jelodar, M B (2021) Integration of project management services for International Engineering, Procurement and Construction projects. Built Environment Project and Asset Management, 11(2), 330-49.

Bhattacharya, S, Momaya, K S and Iyer, K C (2021) Bridging the gaps for business growth among Indian construction companies. Built Environment Project and Asset Management, 11(2), 231-50.

Cevikcan, E and Kose, Y (2021) Optimization of profitability and liquidity for residential projects under debt and equity financing. Built Environment Project and Asset Management, 11(2), 369-91.

Isuri Anuradha, A, Soorige, D and Geekiyanage, D (2021) Comparative study on life cycle assessment of buildings in developed countries and Sri Lanka. Built Environment Project and Asset Management, 11(2), 304-29.

Moyo, T, Crafford, G and Emuze, F (2021) People-centred management for improving construction workers' productivity in Zimbabwe. Built Environment Project and Asset Management, 11(2), 350-68.

  • Type: Journal Article
  • Keywords: labour; productivity; Zimbabwe; communication; gender; leadership; developing countries; demography; training; statistical analysis; construction sites; labor standards; labor productivity
  • ISBN/ISSN:
  • URL: http://dx.doi.org/10.1108/BEPAM-02-2020-0029
  • Abstract:
    While operational factors reduce construction workers' productivity in Zimbabwe, the impact of the people-centred management aspects has not been empirically interrogated as a remedy. This article reports on a study that sought to determine significant people-centred management aspects that lead to improved labour productivity and assesses the existence of statistically significant differences due to the demographic variables of respondents. Demographic-specific strategies that enhance construction "workers" productivity were revealed. The survey research design using a self-administered questionnaire was deployed to collect the primary data. The design followed a positivist paradigm to evaluate objectively how people-centred management affects construction workers' productivity. The statistical data were descriptively and inferentially analysed. People-centred management was determined to be significant in improving construction workers' productivity, with the most significant aspect being the building of employee confidence in related approaches. Designations and educational levels mostly indicated a statistically significant difference in several aspects that included the adoption of a functional reward culture for workers and training on people-centred principles. Training on-site management and construction workers in people-centred management and its application are crucial to improving construction workers' productivity. Construction companies should drastically improve their concern for people while they sustain a high concern for production within their construction sites. Although several factors affect construction workers' productivity, this study determined that management-related factors and people-centred management were significant towards influencing low productivity in Zimbabwe. The study determined people-centred management and demographic-specific interventions as being able to improve construction workers' productivity in Zimbabwe.

Ottou, J A, Baiden, B K, Nani, G and Martin Morgan, T (2021) Benefits of implementing Six Sigma in competitive tendering process. Built Environment Project and Asset Management, 11(2), 214-30.

Safapour, E, Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), 157-73.

Sekar, G, Sambasivan, M and Viswanathan, K (2021) Does size of construction firms matter? Impact of project-factors and organization-factors on project performance. Built Environment Project and Asset Management, 11(2), 174-94.

Sun, J, Balakrishnan, S and Zhang, Z (2021) A resource allocation framework for predisaster resilience management of interdependent infrastructure networks. Built Environment Project and Asset Management, 11(2), 284-303.

Tuffaha, F M, Assaf, S, Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), 195-213.

Verma, S, Mandal, S N, Robinson, S, Bajaj, D and Saxena, A (2021) Investment appraisal and financial benefits of corporate green buildings: a developing economy case study. Built Environment Project and Asset Management, 11(2), 392-408.

Zarghami, S A and Gunawan, I (2021) The emergence and evolution of reliability theory for water distribution networks. Built Environment Project and Asset Management, 11(2), 251-65.